FIRE AND EMS UPDATE 04/06/2021

The link below is a powerpoint we made up to first update the Board Members at the meeting on April 5th.  Please view this powerpoint to get updated on what is happening with our Fire/EMS service.  Let me also say this, We are contracted for coverage through the end of this year and we will have coverage next year.  That is what we are working through at this time.   

https://townofharmony.com/wp-content/uploads/2021/04/Fire-and-EMS-Powerpoint-Public-Posting.pptx

 


Sample Ballots for the April 6 Spring Election

See links below to review sample ballots for the April 6 Spring Election.  Absentee Ballots will start to be mailed out on March 23rd and MUST be returned by 8pm on election day.  

Wards 1-6 Milton School District

https://townofharmony.com/wp-content/uploads/2021/03/Sample-Ballots-for-April-6-2021-Spring-Election-Milton-Schools.pdf

Wards 1-6 Janesville School District

https://townofharmony.com/wp-content/uploads/2021/03/Sample-Ballots-for-April-6-2021-Spring-Election-Janesville-Schools.pdf

 


I90 Construction Updates for Milton Ave between Hwy 14 and John Paul Road

As part of the I-39/90 Project, construction work is underway on WIS 26/Milton Avenue, between US 14/Humes Road and John Paul Road, in Janesville. Early next week, all WIS 26 traffic will shift onto the northbound lanes within these limits.

What you need to know:

  • One lane CLOSED each way on WIS 26/Milton Avenue between US 14 and John Paul Road.
    • 6 p.m. Monday (March 8) to 6 a.m. Tuesday (March 9)
  • Starting Tuesday morning, all WIS 26 traffic will shift onto the northbound lanes. Watch for crews and equipment in the area. 
    • Two lanes will remain OPEN each way with dedicated turn lanes.
    • The speed limit will be reduced to 30 mph. Please slow down!
    • Plan ahead as backups and delays are expected during peak travel times.
    • Access to local businesses is maintained within the work zone.
  • Learn more about the WIS 26 Diverging Diamond Interchange (DDI), including a narrated animation video.
  • The WIS 26 ramp to I-39/90 southbound remains CLOSED until late August 2021.
    • Use alternate routes such as US 14 to the southbound Interstate.
  • Below are the expected construction staging plans for this year as we convert the interchange to a DDI – subject to change.
    • Early March to late June
      • Southbound traffic shifted onto northbound side
    • Late June to July
      • Northbound and southbound traffic on their own side
    • Late July to mid-September
      • Northbound traffic shifted to southbound side
    • Mid-September to mid-October
      • All lanes open during peak periods and interchange operating as a DDI while off-road work is finished.
  • All lane restrictions and work operations are weather dependent and subject to change.

Help us share this information and forward this email to family, friends and co-workers who travel WIS 26/Milton Avenue in Janesville. Encourage them to register for project email updates!

STAY INFORMED: I-39/90 Expansion Project website | I-39/90 Project Facebook page | 2021 Construction Guide | Alternate Route Map

For more information, contact:
Steven Theisen
I-39/90 Project Communications Manager
(608) 884-1230 | [email protected]

WisDOT and the I-39/90 Project Team
www.i39-90.wi.gov
Follow us on Facebook: www.facebook.com/WisconsinI3990Project


Fire Department Meeting 02-24-2021

I feel it important for our residents to understand where our money is being spent and why the Town’s tax levy might have to be increased again.  I have a link below that is a Youtube of the Feb 24, 2021 meeting of the fire commission.  While part of this commission looks at every penny being spent others want to continue to spend.  This meeting is eye opening.  While our contract price tripled from 2020 to 2021 the contract was only for 1 year.  In the past we signed a contract that was three or more years long with small built in increases. I believe we will see another increase of that size or larger for 2022.   I just want our resident informed of what is happening and your voice does count.  We are a contracted entitiy so you do have a say in what is happening.  The next meeting is March 17th at 6pm and is held via zoom.  I will place that link on this website just a day or two before.  Thanks Tim

https://www.youtube.com/watch?v=Mfe7OGLryy0

 


Covid Vaccinations Information UPDATED 02-19-2021

New Vacination Clinic Opens https://townofharmony.com/wp-content/uploads/2021/02/Community-covid-Vaccine-Clinic-soft-open.docx

Should you believe that you may have Covid, the testing sight is open at Blackhawk Technical College. I went for a test on Thursday Feb 18th.  It took only a couple of minutes and I received my test results in 24 hours.  Here is the info…

Free COVID-19 testing is available weekly on Wednesdays and Thursdays from 12 p.m. – 5 p.m. each day at Blackhawk Technical College – Central Campus, located at 6004 South County Highway G, Janesville WI. The first day of testing is October 21st and the last day of testing is March 10th. Please use the US Highway 51 entrance. Pre-registration is strongly recommended but the public can register themselves on-site if necessary. Please pre-register at register.covidconnect.wi.gov. Individuals who are elderly, and/or adults who are physically/developmentally disabled and need assistance registering online for COVID testing, can call the ADRC at 608-741-3600 during business hours (Monday – Friday, 8:00 a.m.- 4:30 p.m.) and receive help registering for a test.

 

As we are all aware, the vaccinations for Covid are becoming available.  In an effort to simplify the information and to get the info available to everyone, Rock County Health Department has partnered with Health Care Providers, and organizers to get the information of ffor who, what, where and when vaccinations are available.  As part of this team I will be providing this information to all Town Clerks in an effort to put this information into the hands of their residents.  In the very near future I will be posting information to this section of our website that will either give you the information you need to know or I will have links available or you to follow to get you to information on the availablilty of the vacination.  Please keep an eye on this location and spread the information via social media and let your neighbors know of any new information that may assist them.  Thank you. 

Tim Tollefson Clerk Town of Harmony.


February 16th Election Election Day Information

Election day for the Spring Primary is February 16th.  Voting hours are from 7am to 8pm on election day.  The voting location for the Town of Harmony is the Town Hall, located at 440 US Hwy 14, Janesville WI.  Located next to Silha Construction.  While this will not be anywhere near as busy at the November 2020 election we will be putting in place the same safety precautions as we used for all of the 2020 Elections.  We will allow only 3 voters in the Town Hall at a time, We will only allow 8 people in the hallway.  Voters will enter through the front door and exit through the back door.  We will have plexiglass shields in front of the election worker tables.  Social Distancing will be in effect.  Should you have any questions please feel free to call or send an email.

Thanks

Tim Tollefson

Clerk